FIHA

Flight Information Handbook Australia
2509
04-Sep-2025 to 26-Nov-2025
2509 FIHA (6.6 MB)
(6.6 MB)
2512
27-Nov-2025 to 18-Mar-2026
Available 10 days prior.

TERMA IFP Plates & XML

Compilation of individual TERMA plates.
2509
04-Sep-2025 to 26-Nov-2025
(35.91 MB)
2512
27-Nov-2025 to 18-Mar-2026
Available 28 days prior.

En-Route Supplement International (ERSI)

ERSI is compiled and published by AIS-AF. It provides details of selected aerodromes whose runway length is greater than 380m (1247 ft) that are contained within the AIS-AF area of coverage. The Tactical Airfield Guide (TAG) section provides details of selected aerodromes that have a runway length between 380m - 914m (1247 ft - 2999ft). 
2509
04-Sep-2025 to 01-Oct-2025
2510
02-Oct-2025 to 29-Oct-2025
Available 7 days prior.

1AIDU Plates and XML

1AIDU Plates and XML
2509
04-Sep-2025 to 26-Nov-2025
2512
27-Nov-2025 to 18-Mar-2026
Available 2 days prior.

AIS-AF International Terminal Procedures (ITP) India

AIS-AF International Terminal Procedures (ITP) India is produced under authority of the Defence AA. It contains authorised instrument flight procedures for airfields in India for use by ADF aircrew.

Date effective
21-Apr-22

AIS-AF International Terminal Procedures (ITP) WMKB Butterworth

AIS-AF International Terminal Procedures (ITP) WMKB RMAF Butterworth is produced under authority of the Defence AA. It contains authorised instrument flight procedures for WMKB RMAF Butterworth for use by ADF aircrew. Effective date: as of the 1901 AIRAC cycle, the ‘effective date’ will no longer be updated each AIRAC cycle and a next effective date will not be published. The ITP will continued to be checked against Malaysian AIP, but the effective date will only update if amendments are made to the procedures. Please check the copy you are using has the same effective date as shown below. The WMKB RMAF Butterworth In-flight Guide is no longer made available due to the errors contained within. Feedback can be provided to vbmais.operations@defence.gov.au

Date effective
17-Apr-25

GPA

General Planning Australia
2509
04-Sep-2025 to 26-Nov-2025
2509 GPA (5.02 MB)
(5.02 MB)
2512
27-Nov-2025 to 18-Mar-2026
Available 10 days prior.

TERMA

Terminal Australia (TERMA) is complied and published by AIS-AF and contains both approach and departure procedures and other relevant aerodrome information for Australian military airfields.
2509
04-Sep-2025 to 26-Nov-2025
2509 TERMA (41.57 MB)
(41.57 MB)
2512
27-Nov-2025 to 18-Mar-2026
Available 28 days prior.

TERMA Waypoints

TERMA Waypoints is compiled by AIS-AF and is a list of waypoints related to all Australian military airfields.
2509
04-Sep-2025 to 01-Oct-2025
(534 bytes)
2510
02-Oct-2025 to 29-Oct-2025
(535 bytes)
Available 7 days prior.

AIB

AIB
2509
04-Sep-2025 to 01-Oct-2025
(192.23 KB)
2510
PNG MSA/VSA Chart

Date effective
16-Jun-22